Scheduling serves to optimise production and control schedules.
Operations can be combined with one another logically and can be graphically depicted in order of their time.
The time values taken from the calculation are available for scheduling based on signature or cost centre.
Jobs can be produced in sheets on various printers or can be split up as per signature.
The subdivided part-production steps each have a cost centre start deadline and cost centre deadline.
Critical appointments are shown on the screen in colour and can be identified at an early stage.
The automatic planning, the dispatcher has the possibility at all times to allocate priorities manually.
Graphic capacity overview of all dispatched cost centres.